This is the bathroom that we designed originally, when the house was built.
The original tiler wasn't the best, so we had issues early on.
We had one leak fixed in the shower soon after installation, and a few years later it looked like we had the problem back. We got the building company to send their tiler to re-grout the joins as a temporary fix.
The original tiler was contracted to the tile supplier we used, not via the builder, so he had no responsibility for the problem.
Eventually we would need to rebuild the shower.
No comments:
Post a Comment